Southern Rural Water is inviting expressions of interest to secure groundwater entitlement from the Lower Tertiary Aquifers (the Childers Formation) in the Corinella Groundwater Management Area.
The total allocation available is 548.9 megalitres.
Southern Rural Water can offer new groundwater entitlements where the current licensed volume is lower than the specified limit. This is the case in the Corinella Groundwater Management Area.
Completed expression of interest forms must be submitted via srw@srw.com.au by 4pm on 31 December 2026.
Once the expression of interest closes, we will undertake a preliminary assessment to determine the level of interest and the eligibility of applicants. The results will inform our next steps, which could be a water auction, a tender process, or another method to fairly apportion available water.
To be eligible to purchase water, you must own or occupy land within the Corinella Groundwater Management Area and have a genuine and approved use for the water. Please note it may require substantial time and financial investment to secure all relevant licences and install a bore to access this groundwater.
We will confirm our allocation pathway with those who have expressed an interest within eight weeks of the expression of interest process deadline and provide details on the next steps.
For more information, please contact 1300 139 510 or srw@srw.com.au.
FAQ's
-
Who can participate in this Expression of Interest process?
Applicants must own or occupy land within the Corinella GMA to be eligible to purchase the water. Applicants who can demonstrate a legitimate use for the water and whose property has access to the available water can take part.
-
How do I participate in the Expression of Interest process?
Participation is via an Expression of Interest (EOI) process. EOI Application forms must be submitted in writing to Southern Rural Water at srw@srw.com.au no later than 4pm on 31 December 2026.
The EOI form requires you to provide the following information to ensure we can determine eligibility:
- The annual volume of water being sought.
- A plan for how the water is to be used. This includes an outline of the business proposal or land to be irrigated and timeframe for development.
- An approximate bore location and depth.
-
Why are you undertaking this EOI?
Southern Rural Water can offer new groundwater or surface water entitlements where the current licensed volume is lower than the specified limit – as is the case in the Corinella Groundwater Management Area. Individuals have approached us directly to express an interest and before we can apportion/sell any water we must undertake a process to determine the level of interest from other users.
-
How much water is available?
548.9 ML of groundwater is available from the Corinella Groundwater Management Area.
Under the current Permissible Consumptive Volume (PCV) up to 2,550 megalitres of water per year could be licensed for extraction. However, recent technical assessments undertaken by the Department of Energy, Environment and Climate Action (Groundwater Sustainable Yield Assessment Overview Report) suggests a total extracted volume of 1,760 megalitres per year is likely more suitable to ensure we avoid unwanted environmental, social or economic impacts.
Taking into account the current licensed volume, this means that 1097.9ML is currently considered to be available for allocation.
Following our internal processes, 50% of this amount is set aside for Traditional Owners, leaving 548.9 megalitres available for allocation to other users.
-
Where is the water available and what is the quality?
The Corinella Groundwater Management Area is a complex and multi-layered groundwater system underlain by several layered aquifers. These include the shallow Quaternary alluvial sand aquifer, the Baxter and Yallock Formation sand aquifers, the Tertiary Volcanics basalt aquifer and the Childers Formation sands at the base. These aquifers contain clay and silty layers and bore yields and water quality will vary from one location to another. In general, the salinity of the aquifers is poorer in the upper aquifer and improves with depth.
-
What happens after the EOI process?
Following the EOI process, Southern Rural Water will assess the level of demand, determine eligibility and define a pathway to apportion the water. The results will inform the pathway forward which could include a process to apportion the water either via auction, tender or other process. We will advise EOI participants within eight weeks of the EOI end date. If we decide to go to auction we will advise the process and provide ample lead time.
-
What are considerations for future licence applications?
Due to the complex nature of this groundwater system, the application process may require the preparation of a hydrogeological impact assessment. This would identify any potential impacts on cultural values, other groundwater users and the broader environment.
Other considerations for future licence applications include:
- Section 57 of the Water Act 1989.
- Impact on other groundwater users.
- The potential for saline intrusion.
- Impact on the Bass River, which is a significant National Groundwater Dependent Ecosystems (GDE).
- Impact on the Westernport RAMSAR and the Western Port Biosphere.
- There is a concentration of domestic and stock licences in the central northern part of the Corinella Groundwater Management Area.
- Currently there is a lack of groundwater monitoring.
- There is limited information about the hydrogeology and groundwater resources of the Corinella Groundwater Management Area.
Successful candidates should contact us before lodging an application to determine the requirements needed as part of their application.
-
How soon can I access water if successfully secured through auction or allocation?
To access and use water legally in Victoria, you are required to hold two licences to access and use groundwater including a Section 51 take and use licence and a section 67 licence to operate works (in this case a bore).
When you submit an expression of interest, we will do an initial assessment of the potential take and use licence prior to a tender/auction. This will determine the likelihood of being able to secure a Section 51 licence.
Eligible expression of interest applicants will be invited to take part in an auction/tender and successful bidders will be issued a Section 51 take and use licence.
Before any water can be taken or used, applicants must also apply for a Section 67 operating licence. This will occur once the bore(s) have been drilled. The Section 67 application process may require information to be provide to Southern Rural Water on bore construction, bore yields and groundwater quality, and the potential impacts of pumping on surrounding bores, and the environment. This application process may require a hydrogeological assessment and an irrigation and drainage plan. If the Section 67 licence process is successful, then the applicant will be authorised to use the bore.
When assessing your application, we need to consider several matters including impacts on current users and nearby waterways, local and government policies, irrigation guidelines (if they apply) and items under Section 40 of the Water Act 1989.
All applications will require neighbour notification processes and be referred to stakeholder agencies (e.g. Catchment Management Authorities) for consideration and comment.
For simple applications, the process may take a few months or up to 12 months for more complex ones as we need to consider a range of matters under Section 40 of the Water Act 1989.
We cannot guarantee application approval and would strongly advise you talk to us before applying so we can advise you before you commit to the application process.
-
Do I have to pay anything now?
No. This process is to inform our decision making based on the interest and demand for water. If we move ahead to apportion the water via auction, tender or other process the relevant fees or costs will be applied at that time.